Vilnius Residents Voicing Concerns About Upcoming Airport Parking Development

Vilnius Residents Voicing Concerns About Upcoming Airport Parking Development

“Once again, everything has been done for car drivers, and they have forgotten about public transport passengers,” Vilnius residents complain after seeing the central square of the airport. Some residents were outraged by the fact that in one place there is a shelter, which is installed from the parking lot to the entrance of the airport, while in another place there is no such shelter. It turns out that it is not where the public transport stops.

“The main shelters were installed in the planned places of the central square, because according to the calculations of our experts and the recommendations of the architects, significantly larger numbers of people gather there, so a structure of this size is in great demand. In these places, where the canopies are now installed, not only short-stop passengers gather (in the “Kiss and Fly” area), but also people from the entire square”, explains Tadas Vasiliauskas, representative of Lithuanian airports to the media.

Covering the entire area with a canopy would simply be impractical. As the representative of the airport explains, if the entire area near the departure terminal is covered with a canopy, the entry of natural light into the terminal spaces would be severely affected. Therefore, the architects decided to cover only part of the space near the departure area with a roof.

Airport representatives assure that the public transport stop is only a few meters from the terminal and the shelter, so there should not be any major inconvenience for passengers. During the reconstruction, the area of ​​the stop with a roof was increased, so from now on it will accommodate more people than before the renovation.

The opening of the new terminal is expected in 2025. February 4 At the moment, intensive works are underway in the new terminal, Vilnius Airport recently shared photos of the new impressive screens. We wrote about it here.

The opening of the central square took place a few days ago. It has three times more parking spaces. Arnas Dūmanas, Head of the Development Department of the Lithuanian Airports (LTOU), said that this was one of the most difficult stages of the airport development project, which was implemented a month earlier than planned.

window.fbAsyncInit = function() {
FB.init({
appId: ‘117218911630016’,
version: ‘v2.10’,
status: true,
cookie: false,
xfbml: true
});
};

(function(d, s, id) {
var js, fjs = d.getElementsByTagName(s)[0];
if (d.getElementById(id)) {
return;
}
js = d.createElement(s);
js.id = id;
js.src = “https://connect.facebook.net/lt_LT/sdk.js”;
fjs.parentNode.insertBefore(js, fjs);
}(document, ‘script’, ‘facebook-jssdk’));

#people #Vilnius #parking #lot #Vilnius #airport #Business
2024-09-08 19:16:32

Here are some PAA (People Also Ask) related questions for ‌the title: **Vilnius Airport’s Central Square Renovation: Addressing Concerns and Improvements**:

Vilnius Airport’s Central‍ Square‌ Renovation: Addressing​ Concerns and Improvements

Vilnius⁢ Airport’s central square‌ has ‌recently undergone ​a major renovation, sparking mixed reactions ‍from residents and travelers. While some have expressed‌ disappointment over the lack of shelters for public transport passengers, airport representatives ⁤and ‌architects have explained the reasoning behind the design decisions. In⁣ this article, we’ll‌ delve into the concerns, explanations, and improvements made to the central square.

Concerns from Residents

Some Vilnius residents have​ expressed frustration,⁣ feeling that the renovation prioritized car drivers over public transport passengers.‌ They pointed ‍out the discrepancy⁤ in shelter provisions, with some areas having canopies while‍ others,‍ including‍ the public transport stop, do not. This perceived oversight ⁤has led to concerns about ⁢the comfort and convenience of public transport ‍users.

Airport Representatives’ Response

Tadas Vasiliauskas, representative of Lithuanian airports, addressed the concerns by explaining that the main shelters were installed in areas with high foot ⁣traffic, such as the “Kiss⁢ and Fly” zone. These structures were designed to accommodate large numbers of people, providing a necessary service to passengers.

Regarding the decision not to cover the entire area with a canopy,​ Vasiliauskas explained that it would have severely impacted natural light ⁣entering the terminal spaces.⁣ Instead, architects opted⁢ to cover ⁢only part of the space near the departure ⁣area, striking a balance between functionality and aesthetics.

Improvements and Assurances

Airport representatives assured that the public transport stop is merely a⁣ few meters from the terminal ⁤and shelter, ⁤minimizing any potential inconvenience for passengers. Moreover, the area of the stop with a roof was increased during ⁣the reconstruction, allowing it to accommodate more people than⁤ before.

New Terminal and Central Square Developments

The central square’s renovation is part of a larger airport development‌ project. ‍The new terminal, expected to open in 2025, is currently undergoing intensive works. Vilnius Airport has shared impressive photos of the new screens, generating excitement among travelers.

The central square’s renovation, which⁣ took place a ⁣few ​days ago, has tripled the number of parking spaces, making it more convenient for travelers. Arnas Dūmanas, Head of the Development Department of the Lithuanian Airports (LTOU), praised the ⁢project’s timely completion, a month ahead of schedule [[2]][[3]].

A New ⁢Era⁢ for Vilnius Airport

As Vilnius Airport continues to expand and modernize, it’s essential to address the concerns of all travelers, including public transport passengers. While⁤ the central square’s renovation‍ may not have met everyone’s ​expectations, the airport’s explanations and ‍assurances ⁤provide⁢ a clearer ‌understanding of the design decisions.

With the new terminal and⁢ central square developments, Vilnius Airport is poised to become an even more efficient and comfortable travel hub. As the airport continues to grow, it’s crucial ⁣to prioritize the needs of all passengers, ensuring a positive travel experience for everyone.

References:

[1]

[2]

[3]

Here are some relevant People Also Ask (PAA) questions for the title **”Vilnius Airport’s Central Square Renovation: Addressing Concerns and Upgrades”**:

Vilnius Airport’s Central Square Renovation: Addressing Concerns and Upgrades

Vilnius Airport, one of the major transportation hubs in Lithuania, has been undergoing significant renovations to enhance the overall passenger experience. The recent overhaul of the central square has raised concerns among locals, particularly public transport passengers, who feel that they have been overlooked in the renovation process. In this article, we will delve into the concerns, explanations, and upgrades that are part of the airport’s development project.

Concerns over Shelter Coverage

Residents of Vilnius have expressed discontent with the fact that shelters have been installed only in certain areas of the central square, while public transport stops are left uncovered. This perceived disparity has led to accusations that the airport has catered primarily to car drivers, neglecting the needs of public transport passengers. According to airport representatives, however, the shelters were strategically placed in areas where larger numbers of people gather, such as the “Kiss and Fly” area, to provide maximum coverage[[[1]].

The Challenges of Canopy Coverage

One of the primary reasons for not covering the entire area with a canopy is the impact it would have on natural light entering the terminal spaces. Architects have opted for a roofed design only in specific areas to ensure an optimal balance between passenger comfort and natural lighting [[2]].

Public Transport Stop Upgrades

Airport representatives have assured that the public transport stop is merely a few meters from the terminal and the shelter, minimizing any potential inconvenience to passengers. In fact, the reconstruction has increased the area of the stop with a roof, allowing it to accommodate more people than before [[3]].

New Departure Terminal and Parking Lot

The new departure terminal, due to open in 2025, will offer a significant upgrade to the airport’s infrastructure. The construction is currently underway, with intensive works aimed at delivering a state-of-the-art facility[[[1]]. Meanwhile, the newly opened central square boasts three times more parking spaces, marking a major milestone in the airport’s development project [[2]].

Addressing Concerns and Moving Forward

While the concerns of public transport passengers are valid, the airport’s explanations and upgrades demonstrate a commitment to enhancing the overall passenger experience. As the airport continues to evolve, it is essential to strike a balance between the needs of different user groups, ensuring that all passengers, regardless of their mode of transport, feel accommodated and valued.

References

[1] Vilnius Airport – New Departure Terminal

[2] International Airport Review – A Closer Look at the New Departure Terminal at Vilnius Airport

[3] Lithuanian Airports – Vilnius Airport’s Temporary Scheme Nears Conclusion

Optimized Keywords: Vilnius Airport, Central Square Renovation, Public Transport, Departure Terminal, Parking Lot, Upgrades.

Leave a Replay