Upcoming Water Protection Work on RN5 at Rivière-Salée: Track Elevation and Minimal Traffic Disruption

2023-10-30 23:00:00

This followingnoon, the CTM presented the water protection work that will be carried out on the RN5 at Rivière-Salée. The track will be raised by more than one meter. The work should begin at the end of November for a period of 2 months. The work is planned mainly at night to disrupt traffic as little as possible. Total cost of the intervention: 1.5 million euros.

1698721653
#water #proofing #work #scheduled #November

Photo of author

Alexandra Hartman Editor-in-Chief

Editor-in-Chief Prize-winning journalist with over 20 years of international news experience. Alexandra leads the editorial team, ensuring every story meets the highest standards of accuracy and journalistic integrity.

Emiliano Martinez Wins Yachine Trophy at Ballon d’Or Ceremony, Thibaut Courtois Snubbed

Discover the Enchanting Festival of Lights in Mons: A Celebration of Art, Architecture, and Poetry

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.