The seventh day publishes pictures of the implementation of the work of the second line of the express electric train, which is being implemented from (October / Luxor / Aswan / Abu Simbel) and has a length of 1100 km, in conjunction with the construction of the first line from Ain Sokhna to Alexandria and Matrouh.
And a system Express electric train Environmental friendliness will be a huge qualitative leap in Green transportation In addition to being development arteries that serve the new and existing urban and industrial areas, they will contribute to reducing and shortening the time of trips between the governorates to more than half the time that the citizen currently takes, whether through the old train network or through the current roads linking the governorates. It also serves transportation. goods between ports and provinces.
The high-speed electric train network consists of 3 main lines with a total length of regarding 2,000 km, of which regarding 1,400 km serve Upper Egypt, in parallel with the ongoing development of the existing railway network with a length of 10,000 km.
Earthen bridges, bridges, and industrial works for the track, stations, and fences are being implemented by major Egyptian companies specialized in these fields, in addition to industrial works on roads intersecting with the train track. , and others, in addition to manufacturing and supplying mobile units of all kinds, including express trains, regional trains, and electric tractors, as well as designing, supplying and installing workshop equipment.
Engineer Kamel Al-Wazir, Minister of Transport, inspected the work sites of the second line of the express electric train (October / Luxor / Aswan / Abu Simbel), which has a length of 1100 km, in order to follow up the rates of implementation of the project in the distance from Assiut to Sohag, with a length of regarding 110 km.