| Ruta |
Section Status |
Transit |
| LARGE GATE – CHIHUIDOS – EMP RP 7 |
EQUIPMENT OPERATING. HEAVY TRAFFIC. |
TCP |
| CHOS MALAL – TRICAO MALAL – HUINGANCO FIELD |
POOLED AND CLAY SECTORS |
TCP |
| EMP. RN 40 – MARIANO MORENO – EMP. RP 16 |
ROAD WITH DEFORMATIONS. |
TCP |
| EL HUECU – MALLÍN LARGO – NAUNAUCO – EMP. RN 40 |
SECTORS PUCED, MUD AND SERRUCHO. |
TCP |
| EMP. RP 7 (WATER POINT) – RINCÓN DE LOS SAUCES |
EQUIPMENT OPERATING IN THE REPAVEMENT WORK. HEAVY TRAFFIC. |
TCP |
| OCTAVIO PICO – CATRIEL CRUISE |
MUD ON ROAD. HEAVY TRAFFIC. acc. A PATA MORA A ACC. OCTAVIO PICO. SECTORS WITH SAW. |
TCP |
| CATRIEL CRUISE – RINCON DE LOS SAUCES |
HEAVY TRAFFIC. |
TCP |
| CORNER OF LOS SAUCES – PUESTO HERNÁNDEZ – EMP. RN 40 |
POOLED SECTORS. |
TCP |
| CHOS MALAL – THE CHOLAR |
POCKED AND SAW SECTORS. |
TCP |
| EL CHOLAR – PICHACHEN |
SECTORS WITH SNOW. INTERNATIONAL PASS DISABLED |
TCP |
| NEUQUÉN – CENTENARY – EMP RP 51 |
HEAVY TRAFFIC. DIVERSIONS DUE TO ROAD DUPLICATION WORKS. |
TCP |
| LTE C/RÍO NEGRO – EL CRUCE (EMP RP 8) |
HEAVY TRAFFIC. |
TCP |
| EMP RP 8 (EL CRUCE) – AÑELO (EMP. RP 17) |
CAUTION DUE TO ACCUMULATION OF WATER AND SEDIMENTS IN SECTORS. |
TCP |
| AñELO (EMP. RP 17) – EMP. RP 5 |
PRESENCE OF EQUIPMENT AND PERSONNEL WORKING ON EMBANKMENT REMEDIATION AND SHOULDER STABILIZATION TASKS |
TCP |
| EMP. RP 5 – LOS RANQUILES – EMP. RN 40 |
POOLED SECTORS. |
TCP |
| EMP. RP 51 – EMP. RP 7 |
HEAVY TRAFFIC. |
TCP |
| EMP. RP 7 (THE CROSSING) – CATRIEL CRUISE |
SECTORS WITH SAW. EQUIPMENT OPERATING. |
TCP |
| THE CRUISES – MOQUEHUE (EMP. RP 13) |
SNOW AND ICE ON ROADWAY. ONE HAND ENABLED. POOLED SECTORS AND MUD. STRAY ANIMALS. MANDATORY CARRYING OF CHAINS. EQUIPMENT OPERATING. |
TCP |
| MOQUEHUE – ÑORQUINCO |
SNOW AND ICE ON ROADWAY. POOLED SECTORS AND MUD. STRAY ANIMALS. MANDATORY CARRYING OF CHAINS. EQUIPMENT OPERATING. |
TCP |
| ÑORQUINCO – EMP. RP 23 |
ICE ON ROAD. POOLED SECTORS AND MUD. STRAY ANIMALS. MANDATORY CARRYING OF CHAINS. EQUIPMENT OPERATING. |
TCP |
| ZAPALA – FIRST PINES |
SECTORS WITH ICE. CARRY CHAINS. EQUIPMENT OPERATING. IT IS RECOMMENDED NOT TO TRAFFIC AT NIGHT |
TCP |
| FIRST PINES – LITRÁN |
SECTORS WITH ICE. MANDATORY CARRYING OF CHAINS. EQUIPMENT OPERATING. |
TCP |
| LITRÁN – ANGOSTURA – GENDARMERIE – BATEA MAHUIDA |
WET ASPHALT TAPE, POSSIBLE FORMATION OF ICE.. SECTORS WITH POTS. MANDATORY CARRYING OF CHAINS. |
TCP |
| ANGOSTURA / GENDARMERIE – ICALMA PASS |
ICE AND SNOW ON ROADWAY. EQUIPMENT OPERATING. MANDATORY CARRYING OF CHAINS. |
TCP |
| ICALMA STEP |
ICE ON THE ROAD. EQUIPMENT OPERATING. OBLIGATORY CARRYING OF CHAINS. STEP ENABLED |
TCP |
| ZAPALA (EMP. RN 22) – COVUNCO DOWNTOWN |
WET ASPHALT TAPE. ROADWAY WITH DEFORMATIONS. |
TCP |
| COVUNCO CENTER – EMP RN 40 (ACC. BAJADA DEL AGRIO) |
EQUIPMENT OPERATING, PARTIAL RIPPED. |
TCP |
| THREE STONES – PASS OF THE INDIANS RAFT |
POCKED SECTORS.LOOSE GRAVEL |
TCP |
| EMP. RP 8 – YEAR |
SECTORS WITH SAWS. HEAVY TRAFFIC. EQUIPMENT OPERATING. |
TCP |
| YEAR – PLAZA HUINCUL |
PRECAUTION DUE TO ACCUMULATION OF WATER AND SEDIMENT ON THE ROAD IN SECTORS |
TCP |
| PLAZA HUINCUL – PICÚN LEUFú (EMP. RN 237) |
SECTORS WITH POTHOLES. |
TCP |
| EMP. RP 23 – RUCA CHOROI |
SECTORS WITH ICE. CROSS SECTIONS. STRAY ANIMALS. MANDATORY CARRYING OF CHAINS. |
TCP |
| EMP.RN 40 – CERRO CHAPELCO |
SNOW ON THE ROAD. MANDATORY USE OF CHAINS. |
TCP |
| PICÚN LEUFú – LIMAY CENTRO – PASO AGUERRE – EMP. RN 40 |
SECTORS WITH MUD. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
| EMP. RN 40 (AGUADA DEL OVERO) – SOUTH CHACAICO – EMP. RP 46 (SPINAZO DEL ZORRO) |
SECTORS WITH MUD. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
| EMP. RN 242 – HUARENCHENQUE – LONCOPUé |
|
T |
| LONCOPUé – EL HUECU |
SECTORS WITH SAW. |
TCP |
| EL HUECU – MANDOLEGUE – EL CHOLAR |
SECTORS PUCED, MUD AND SERRUCHO. |
TCP |
| NEUQUEN – ARROYITO |
HEAVY TRAFFIC. |
TCP |
| ARROYITO – PLAZA HUINCUL – CUTRAL-Có |
ICE FORMATION POSSIBLE. STRONG GUSTS OF WIND. ZONE WITH LOOSE ANIMALS. |
TCP |
| CUTRAL-Có – ZAPALA |
ICE FORMATION POSSIBLE. STRONG GUSTS OF WIND. ZONE WITH LOOSE ANIMALS. |
TCP |
| JUNÍN DE LOS ANDES – MALLEO |
SNOW AND ICE ON ROADWAY. LOW ADHESION. OBLIGATORY CARRYING DECADES. |
TCP |
| MALLEO – PILO LIL |
SNOW AND ICE ON ROADWAY. LOW ADHESION. MANDATORY CARRYING OF CHAINS. |
TCP |
| PILO LIL – RAHUE (EMP. RP 46) |
SNOW AND ICE. POOLED SECTORS AND MUD. STRAY ANIMALS. MANDATORY CARRYING OF CHAINS. |
TCP |
| RAHUE (EMP. RP 46) – ALUMINATED |
SECTORS WITH ICE. CARRYING CHAINS. |
TCP |
| ALUMINé – LITRÁN (EMP. RP 13) |
SECTORS WITH ICE. ROAD WITH DEFORMATIONS. STRAY ANIMALS. CARRYING CHAINS. |
TCP |
| EMP. RP 13 (LITRÁN) – AXED PINE |
SNOW AND ICE. MANDATORY CARRYING OF CHAINS. SECTION TO CONFIRM. |
I |
| EMP. RN 40 (CALCATRE) – LAS COLORADAS – FORTIN 1º DE MAYO (EMP. RP 46) |
POOLED SECTORS. |
TCP |
| LONCOPUé – RISCOS BAYOS – HUALCUPéN |
|
T |
| HUALCUPEN – CAJÓN CHICO – CAVIAHUE |
WET ASPHALT TAPE. MANDATORY CARRYING OF CHAINS. |
TCP |
| CAVIAHUE – COPAHUE |
DUE TO ACCUMULATION OF SNOW. |
I |
| EMP. RP 33 – HUNCAL – RANQUILóN – EMP. RP 4 |
POCKED AND SAW SECTORS. |
TCP |
| LONCOPUé – HUNCAL (EMP. RP 10) |
POCKED AND SAW SECTORS. |
TCP |
| EMP. RN 40 – QUINTUCO – EMP. RP 10 |
POCKED AND SAW SECTORS. |
TCP |
| EMP. RP 2 – WAYLE |
NO WINTER MAINTENANCE |
I |
| WAYLE – LAGUNA TRóMEN – EMP. RP 53 |
NO WINTER MAINTENANCE |
I |
| ANDACOLLO – THE MICHES |
POOLED SECTORS. |
TCP |
| ANDACOLLO – HUINGANCO |
POOLED SECTORS. SECTORS WITH MUD. SECTORS WITH LANDSLIDES. |
TCP |
| CHOS MALAL – BARRANCAS |
ICE FORMATION POSSIBLE. STRONG GUSTS OF WIND. ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS. |
TCP |
| LAS LAJAS (EMP. RN 242) – CHOS MALAL |
ICE FORMATION POSSIBLE. ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS. |
TCP |
| ZAPALA – LAS LAJAS (EMP. RN 242) |
ICE FORMATION POSSIBLE. ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS. |
TCP |
| ZAPALA – LA RINCONADA (EMP. RN 234) |
PASSABLE WITH EXTREME CAUTION. WET ROAD. SECTORS WITH ICE. POSSIBLE FALL OF STONES ON THE SLOPE OF LA RINCONADA. MANDATORY CARRYING OF CHAINS. |
TCP |
| LA RINCONADA – JUNÍN DE LOS ANDES – SAN MARTIN DE LOS ANDES |
LOW ADHESION DUE TO SNOW. MANDATORY USE OF CHAINS. ZONE WITH LOOSE ANIMALS. |
TCP |
| SAN MARTIN DE LOS ANDES – ACC. CHAPELCO |
LOW ADHESION DUE TO SNOW. MANDATORY USE OF CHAINS. ZONE WITH LOOSE ANIMALS. |
TCP |
| ACC. CHAPELCO – LAGO VILLARINO |
LOW ADHESION DUE TO SNOW. MANDATORY USE OF CHAINS. ZONE WITH LOOSE ANIMALS. |
TCP |
| LAKE VILLARINO – EMP. RN 231 – VILLA LA ANGOSTURA |
LOW ADHESION DUE TO SNOW. MANDATORY USE OF CHAINS. ZONE WITH LOOSE ANIMALS. |
TCP |
| VILLA LA ANGOSTURA – EMP. RN 237 |
PASSABLE WITH EXTREME CAUTION. SECTORS WITH SNOW AND RAIN. ICE FORMATION POSSIBLE. POSSIBLE FALL OF STONES AT KM 2,095. MANDATORY CARRYING OF CHAINS. |
TCP |
| EMP. RN 237 – PTE RíO LIMAY (LTE C/RíO NEGRO) |
WET ROAD. SECTORS WITH SNOWY. POSSIBLE FALLING OF STONES AT KM 2095 MANDATORY CARRYING OF CHAINS. |
TCP |
| ACC QUILA QUINA (RN 40) |
POOLED SECTORS AND MUD. MANDATORY CARRYING OF CHAINS. |
TCP |
| acc. BEAUTIFUL LAKE (RN 40) |
POOLED AND CLAY SECTORS |
TCP |
| ACC. CAMPING CATRITRE (RN 40) |
POOLED SECTORS AND MUD. |
TCP |
| EMP. RP 43 (CAEPE MALAL) – AQUIHUECO – CAJÓN DEL CURI LEUVú |
POOLED SECTORS. |
TCP |
| CHOS MALAL – THE MENUCOS – THE SPRING |
|
T |
| THE SPRING – THE PLAIN – ANDACOLLO |
|
T |
| ANDACOLLO – CAYANTA – BELLA VISTA – THE SHEEP |
|
T |
| THE SHEEP – VARVARCO – Aº AILINCO |
UNTIL ATREHUCO SECTORS POCEADOS AND BARRO. VARVARCO – AºAILINCO IMTRANSITABLE |
TCP |
| EMP. RN 40 (10 KM FROM ZAPALA) – EMP. RP 24 |
SECTORS WITH ICE. MANDATORY CARRYING OF CHAINS. EQUIPMENT OPERATING. |
TCP |
| EMP. RP 24 – RAHUE (EMP. RP 23) |
SECTORS WITH ICE, STRONG GUSTS OF WIND. MANDATORY CARRYING OF CHAINS. EQUIPMENT OPERATING. |
TCP |
| RAHUE (EMP. RP 23) – LAGO QUILLéN – LAGO HUI HUI |
SECTORS WITH ICE. CARRYING CHAINS. STRAY ANIMALS. |
TCP |
| SAN MARTIN DE LOS ANDES – PASS HUA HUM |
SNOW AND ICE ON ROADWAY. POOLED SECTORS AND MUD. MANDATORY CARRYING OF CHAINS. |
TCP |
| ACC. BANDURRIAS (RP 48) |
SNOW AND ICE ON ROADWAY. POOLED SECTORS AND MUD. MANDATORY CARRYING OF CHAINS. |
TCP |
| ACC. CHACHIN – LAKE QUEEN (RP 48) |
SNOW AND ICE ON ROADWAY. POOLED SECTORS AND MUD. MANDATORY CARRYING OF CHAINS. |
TCP |
| PASO HUA HUM |
SNOW AND ICE ON ROADWAY. POOLED SECTORS AND MUD. MANDATORY CARRYING OF CHAINS. . STEP INT. HUA HUM ENABLED. PRESENCE OF LOOSE ANIMALS. |
TCP |
| EMP. RN 237 – EMP. RN 234 |
POOLED SECTORS AND MUD. |
TCP |
| EMP. RP 7 – EMP. RP 8 |
EQUIPMENT OPERATING |
TCP |
| EMP. RN 40 – EMP. RP 62 (COLOHUINCUL) |
SNOW ON THE ROAD. POOLED SECTORS AND MUD. DETERIORATED COLLUNCO BRIDGE. MANDATORY USE OF CHAINS. |
TCP |
| EMP. PR 23 – LANÍN PN COVER |
ICE AND SNOW ON THE ROAD. MANDATORY CARRYING OF CHAINS. |
TCP |
| HOME PN LANÍN – PASS MAMUIL MALAL (LTE WITH CHILE) |
SNOW ON THE ROAD. MANDATORY CARRYING OF CHAINS. |
TCP |
| PASS MAMUIL MALAL (EXTROMEN) |
ICE AND SNOW ON ROADWAY. EQUIPMENT OPERATING. MANDATORY USE OF CHAINS. INTERNATIONAL PASS ENABLED FROM 09:00 TO 18:00 |
TCP |
| JUNÍN DE LOS ANDES (EMP. RN 40) – PTE CHIMEHUÍN RIVER – LAKE PAIMúN |
SNOW AND ICE ON THE ROAD. MANDATORY CARRYING OF CHAINS. |
TCP |
| SAN MARTÍN DE LOS ANDES (EMP. RN 40) – LAKE LOLOG AND CARRUHUé – LAHUENCó EPULAFQUEN – CARRIRRIñE PASS |
SECTORS WITH SNOW AND ICE. MANDATORY USE OF CHAINS. COLO HUINCUL – THE HOT SPRINGS. IMTRANSITABLE CARIRRIñE INTERNATIONAL PASS. |
TCP |
| EMP. RN 40 – MELIQUINA RIVER PTE – FILO HUA HUM RIVER PTE – CÓRDOBA PASS – CONFLUENCIA (EMP. RN 237) |
SNOW ON THE ROAD. MANDATORY USE OF CHAINS. CORDOBA PASS – CONFLUENCIA: DETERIORATED ROAD, EXTREME CAUTION. |
TCP |
| EMP. RP 63 – CALEUFú – LAGO FILO HUA HUM |
SNOW ON ROAD. MANDATORY USE OF CHAINS. POOLED SECTORS AND MUD. |
TCP |
| CONFLUENCE – VILLA TRAFUL – EL PORTEZUELO |
SNOW AND ICE ON THE ROAD. OBLIGATORY CARRYING OF CHAINS. POOLED SECTORS AND MUD. VILLA TRAFUL – EL PORTEZUELO: WORK IN PROGRESS. CARRY CHAINS. |
TCP |
| EMP. RN 40 – BAYO HILL |
SNOW AND ICE ON ROADWAY. POOLED SECTORS. MANDATORY CARRYING OF CHAINS. |
TCP |
| EMP. RN 40 (6 KM FROM VILLA LA ANGOSTURA) – CARDENAL SAMORÉ PASS |
WET ROAD, SECTORS WITH SNOWY. ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS. |
TCP |
| PASS CARDENAL SAMOré |
WET ROAD, SECTORS WITH SNOW AND ICE. MANDATORY CARRYING OF CHAINS. STEP ENABLED |
TCP |
| LA RINCONADA (EMP. RN 40) – PTE COLLÓN CURá (EMP. RN 237) |
ICE FORMATION POSSIBLE. MANDATORY CARRYING OF CHAINS. |
TCP |
| EMP. RN 22 (ARROYITO) – STONE OF THE EAGLE |
WET ROAD, SECTORS WITH RAIN. ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS. |
TCP |
| STONE OF THE EAGLE – PTE COLLÓN CURá (EMP. RN 234) |
SECTORS WITH SNOW AND ICE. MANDATORY CARRYING OF CHAINS. ZONE WITH LOOSE ANIMALS. |
TCP |
| PTE COLLÓN CURA (EMP. RN 234) – CONFLUENCE (EMP. RP 63 AND 65) |
SECTORS WITH SNOW AND ICE. MANDATORY CARRYING OF CHAINS. ZONE WITH LOOSE ANIMALS. |
TCP |
| CONFLUENCE – EMP. RN 40 |
SECTORS WITH SNOW AND ICE. MANDATORY CARRYING OF CHAINS. ZONE WITH LOOSE ANIMALS. |
TCP |
| LAS LAJAS (EMP. RN 40) – EMP. RP 21 |
SECTORS WITH ICE. |
TCP |
| EMP. RP 21 – EMP. RP 23 (A 500M CUSTOMS AX PINE) |
ICE AND SNOW. EQUIPMENT OPERATING, FALLING STONES. |
TCP |
| EMP. RP 23 – AX PINE PASS |
ACCUMULATION OF ICE AND SNOW. EQUIPMENT OPERATING. |
I |
| STEP PINE AX |
EQUIPMENT OPERATING. AX PINE STEP ENABLED FROM 11 HS. KM 48 STONE FALL. SECTORS WITH ICE |
TCP |