Ruta |
Section Status |
Transit |
LARGE GATE – CHIHUIDOS – EMP RP 7 |
EQUIPMENT OPERATING. HEAVY TRAFFIC. |
TCP |
CHOS MALAL – TRICAO MALAL – HUINGANCO FIELD |
SECTORS WITH SAWS. |
TCP |
EMP. RN 40 – MARIANO MORENO – EMP. RP 16 |
ROAD WITH DEFORMATIONS. |
TCP |
EL HUECU – MALLÍN LARGO – NAUNAUCO – EMP. RN 40 |
|
T |
EMP. RP 7 (WATER POINT) – RINCÓN DE LOS SAUCES |
ROAD EQUIPMENT AND PERSONNEL OPERATING IN THE REPAVEMENT WORK. INTERMITTENT CUTS AND DIVERSIONS. SECTORS WITH POTHOLES. |
TCP |
OCTAVIO PICO – CATRIEL CRUISE |
MUD ON ROAD. HEAVY TRAFFIC. acc. A PATA MORA A ACC. OCTAVIO PICO. SECTORS WITH SAWS. |
TCP |
CATRIEL CRUISE – RINCON DE LOS SAUCES |
HEAVY TRAFFIC. |
TCP |
CORNER OF LOS SAUCES – PUESTO HERNÁNDEZ – EMP. RN 40 |
POOLED SECTORS AND MUD. EQUIPMENT OPERATING. |
TCP |
CHOS MALAL – THE CHOLAR |
POOLED SECTORS. |
TCP |
EL CHOLAR – PICHACHEN |
NORMAL. CHACAICO – PICHACHEN: INTERNATIONAL PASSING ENABLED |
T |
NEUQUÉN – CENTENARY – EMP RP 51 |
HEAVY TRAFFIC. |
TCP |
LTE C/RÍO NEGRO – EL CRUCE (EMP RP 8) |
HEAVY TRAFFIC. |
TCP |
EMP RP 8 (EL CRUCE) – AÑELO (EMP. RP 17) |
CAUTION DUE TO ACCUMULATION OF WATER AND SEDIMENTS IN SECTORS. |
TCP |
AñELO (EMP. RP 17) – EMP. RP 5 |
PRESENCE OF EQUIPMENT AND PERSONNEL WORKING ON EMBANKMENT REMEDIATION AND SHOULDER STABILIZATION TASKS |
TCP |
EMP. RP 5 – LOS RANQUILES – EMP. RN 40 |
SECTORS WITH MUD ON THE ROAD AND CROSS SECTIONS. EQUIPMENT OPERATING. |
TCP |
EMP. RP 51 – EMP. RP 7 |
HEAVY TRAFFIC. |
TCP |
EMP. RP 7 (THE CROSSING) – CATRIEL CRUISE |
SECTORS WITH SAW. EQUIPMENT OPERATING. |
TCP |
THE CRUISES – MOQUEHUE (EMP. RP 13) |
POOLED SECTORS, REDUCED VISIBILITY, LOOSE GRAVEL. STRAY ANIMALS |
TCP |
MOQUEHUE – ÑORQUINCO |
POOLED SECTORS, LOOSE GRAVEL. EQUIPMENT OPERATING. |
TCP |
ÑORQUINCO – EMP. RP 23 |
POOLED SECTORS, REDUCED VISIBILITY DUE TO SUSPENDED DUST, LOOSE CRAP. STRAY ANIMALS. EQUIPMENT OPERATING. |
TCP |
ZAPALA – FIRST PINES |
SECTORS WITH POTHOLES. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
FIRST PINES – LITRÁN |
CAUTION DUE TO POOLED SECTORS, AND PRESENCE OF ANIMALS BY DRIVE IN THE CARRERI AREA. |
TCP |
LITRÁN – ANGOSTURA – GENDARMERIE – BATEA MAHUIDA |
|
T |
ANGOSTURA / GENDARMERIE – ICALMA PASS |
EQUIPMENT OPERATING. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
ICALMA STEP |
STEP ENABLED. |
T |
ZAPALA (EMP. RN 22) – COVUNCO DOWNTOWN |
ROAD WITH DEFORMATIONS. EQUIPMENT OPERATING. |
TCP |
COVUNCO CENTER – EMP RN 40 (ACC. BAJADA DEL AGRIO) |
EQUIPMENT OPERATING, PARTIAL RIPPED. |
TCP |
THREE STONES – PASS OF THE INDIANS RAFT |
POCKED SECTORS.LOOSE GRAVEL |
TCP |
EMP. RP 8 – YEAR |
SECTORS WITH SAWS. HEAVY TRAFFIC. EQUIPMENT OPERATING. |
TCP |
YEAR – PLAZA HUINCUL |
PRECAUTION DUE TO ACCUMULATION OF WATER AND SEDIMENT ON THE ROAD IN SECTORS |
TCP |
PLAZA HUINCUL – PICÚN LEUFú (EMP. RN 237) |
SECTORS WITH POTHOLES. |
TCP |
EMP. RP 23 – RUCA CHOROI |
POOLED SECTORS. STRAY ANIMALS. EQUIPMENT OPERATING. |
TCP |
EMP.RN 40 – CERRO CHAPELCO |
EQUIPMENT OPERATING IN CALZADA WIDENING |
TCP |
PICÚN LEUFú – LIMAY CENTRO – PASO AGUERRE – EMP. RN 40 |
SECTORS WITH MUD. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
EMP. RN 40 (AGUADA DEL OVERO) – SOUTH CHACAICO – EMP. RP 46 (SPINAZO DEL ZORRO) |
SECTORS WITH MUD. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
EMP. RN 242 – HUARENCHENQUE – LONCOPUé |
PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
LONCOPUé – EL HUECU |
POOLED SECTORS. EQUIPMENT OPERATING. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
EL HUECU – MANDOLEGUE – EL CHOLAR |
POOLED SECTORS. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
NEUQUEN – ARROYITO |
|
T |
ARROYITO – PLAZA HUINCUL – CUTRAL-Có |
|
T |
CUTRAL-Có – ZAPALA |
|
T |
JUNÍN DE LOS ANDES – MALLEO |
PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
MALLEO – PILO LIL |
PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
PILO LIL – RAHUE (EMP. RP 46) |
POOLED SECTORS. ROCKFALL. EQUIPMENT OPERATING. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
RAHUE (EMP. RP 46) – ALUMINATED |
EQUIPMENT AND PERSONNEL OPERATING IN REPAVEMENT WORK, DIVERSIONS IN URBAN AREA. RESPECT THE INDICATIONS OF BANDERILLEROS AND SIGNALING. |
TCP |
ALUMINé – LITRÁN (EMP. RP 13) |
SECTORS WITH POTHOLES, MUD AND POCKETS. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
EMP. RP 13 (LITRÁN) – AXED PINE |
EQUIPMENT OPERATING IN PAVING TASKS. |
TCP |
EMP. RN 40 (CALCATRE) – LAS COLORADAS – FORTIN 1º DE MAYO (EMP. RP 46) |
POOLED SECTORS. |
TCP |
LONCOPUé – RISCOS BAYOS – HUALCUPéN |
PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
HUALCUPEN – CAJÓN CHICO – CAVIAHUE |
PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
CAVIAHUE – COPAHUE |
CAVIAHUE- EMP. PR No. 27: POOLED SECTORS. EMP. RP Nº 27 UP TO COPAHUE: CAUTION EQUIPMENT OPERATING IN RIPIDATION TASKS. PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
EMP. RP 33 – HUNCAL – RANQUILóN – EMP. RP 4 |
POOLED SECTORS. |
TCP |
LONCOPUé – HUNCAL (EMP. RP 10) |
POCKED AND SAW SECTORS. |
TCP |
EMP. RN 40 – QUINTUCO – EMP. RP 10 |
POOLED SECTORS. |
TCP |
EMP. RP 2 – WAYLE |
NO WINTER MAINTENANCE |
I |
WAYLE – LAGUNA TRóMEN – EMP. RP 53 |
NO WINTER MAINTENANCE |
I |
ANDACOLLO – THE MICHES |
POOLED SECTORS. |
TCP |
ANDACOLLO – HUINGANCO |
ROAD EQUIPMENT AND PERSONNEL OPERATING IN PAVING WORKS, DIVERSIONS. |
TCP |
CHOS MALAL – BARRANCAS |
STRAY ANIMALS. |
TCP |
LAS LAJAS (EMP. RN 242) – CHOS MALAL |
STRAY ANIMALS. |
TCP |
ZAPALA – LAS LAJAS (EMP. RN 242) |
STRAY ANIMALS. |
TCP |
ZAPALA – LA RINCONADA (EMP. RN 234) |
STRAY ANIMALS |
TCP |
LA RINCONADA – JUNÍN DE LOS ANDES – SAN MARTIN DE LOS ANDES |
STRAY ANIMALS |
TCP |
SAN MARTIN DE LOS ANDES – ACC. CHAPELCO |
DRY ROAD |
TCP |
ACC. CHAPELCO – LAGO VILLARINO |
DRY ROAD. STRAY ANIMALS. |
TCP |
LAKE VILLARINO – EMP. RN 231 – VILLA LA ANGOSTURA |
DRY ROAD. ZONE WITH LOOSE ANIMALS. |
TCP |
VILLA LA ANGOSTURA – EMP. RN 237 |
DRY ROAD |
TCP |
EMP. RN 237 – PTE RíO LIMAY (LTE C/RíO NEGRO) |
DRY ROAD |
TCP |
ACC QUILA QUINA (RN 40) |
POOLED SECTORS AND MUD. MANDATORY CARRYING OF CHAINS. |
TCP |
acc. BEAUTIFUL LAKE (RN 40) |
POOLED AND CLAY SECTORS |
TCP |
ACC. CAMPING CATRITRE (RN 40) |
POOLED SECTORS AND MUD. |
TCP |
EMP. RP 43 (CAEPE MALAL) – AQUIHUECO – CAJÓN DEL CURI LEUVú |
SECTORS WITH SAW. |
TCP |
CHOS MALAL – THE MENUCOS – THE SPRING |
PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
THE SPRING – THE PLAIN – ANDACOLLO |
PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
ANDACOLLO – CAYANTA – BELLA VISTA – THE SHEEP |
PRESENCE OF ANIMALS BY TRANSHUMANCE |
TCP |
THE SHEEP – VARVARCO – Aº AILINCO |
POOLED AND MUD SECTORS.. REST: IMPASSABLE |
TCP |
EMP. RN 40 (10 KM FROM ZAPALA) – EMP. RP 24 |
ROAD EQUIPMENT OPERATING IN THE REPAVEMENT WORK. SECTORS WITH POTHOLES. PRESENCE OF LOOSE ANIMALS |
TCP |
EMP. RP 24 – RAHUE (EMP. RP 23) |
EQUIPMENT OPERATING. |
TCP |
RAHUE (EMP. RP 23) – LAGO QUILLéN – LAGO HUI HUI |
POOLED SECTORS AND MUD. EQUIPMENT OPERATING. |
TCP |
SAN MARTIN DE LOS ANDES – PASS HUA HUM |
POOLED SECTORS. |
TCP |
ACC. BANDURRIAS (RP 48) |
POOLED SECTORS. |
TCP |
ACC. CHACHIN – LAKE QUEEN (RP 48) |
POOLED SECTORS. |
TCP |
PASO HUA HUM |
POOLED SECTORS. EQUIPMENT OPERATING. STEP INT. HUA HUM ENABLED FROM 9 TO 8 PM. |
TCP |
EMP. RN 237 – EMP. RN 234 |
POOLED SECTORS AND MUD. |
TCP |
EMP. RP 7 – EMP. RP 8 |
EQUIPMENT OPERATING |
TCP |
EMP. RN 40 – EMP. RP 62 (COLOHUINCUL) |
POOLED SECTORS. |
TCP |
EMP. PR 23 – LANÍN PN COVER |
|
T |
HOME PN LANÍN – PASS MAMUIL MALAL (LTE WITH CHILE) |
POOLED SECTORS AND MUD. |
TCP |
PASS MAMUIL MALAL (EXTROMEN) |
POOLED SECTORS AND MUD. PASS MAMUIL MALAL ENABLED FROM 9 AM TO 6 PM. |
TCP |
JUNÍN DE LOS ANDES (EMP. RN 40) – PTE CHIMEHUÍN RIVER – LAKE PAIMúN |
POOLED SECTORS AND MUD. EQUIPMENT OPERATING, UNRIPPED TASKS |
TCP |
SAN MARTÍN DE LOS ANDES (EMP. RN 40) – LAKE LOLOG AND CARRUHUé – LAHUENCó EPULAFQUEN – CARRIRRIñE PASS |
DEFORMATIONS IN THE ROAD. IN RIPPIATED SECTION REDUCED VISIBILITY, LOOSE GRAVEL. LOLOG ACCESS WITH CAUTION: EQUIPMENT OPERATING. CARIRRIñE: IMPASSABLE. |
TCP |
EMP. RN 40 – MELIQUINA RIVER PTE – FILO HUA HUM RIVER PTE – CÓRDOBA PASS – CONFLUENCIA (EMP. RN 237) |
POOLED SECTORS, REDUCED VISIBILITY, LOOSE GRAVEL. RECOMMENDED MAX SPEED 20 KM/H. FROM IMPASSABLE DPV CAMP |
TCP |
EMP. RP 63 – CALEUFú – LAGO FILO HUA HUM |
POOLED SECTORS AND MUD. |
TCP |
CONFLUENCE – VILLA TRAFUL – EL PORTEZUELO |
POOLED SECTORS AND MUD. acc. CUYIN APPLE TREE: STONE DETACHMENT. VILLA TRAFUL – EL PORTEZUELO: WORK IN PROGRESS, RESPECT SIGNS. RECOMMENDED MAX SPEED 20 KM/H |
TCP |
EMP. RN 40 – BAYO HILL |
POOLED SECTORS, LOOSE GRAVEL. |
TCP |
EMP. RN 40 (6 KM FROM VILLA LA ANGOSTURA) – CARDENAL SAMORÉ PASS |
DRY ROAD |
TCP |
PASS CARDENAL SAMOré |
STEP ENABLED FROM 8 TO 18 PM. |
TCP |
LA RINCONADA (EMP. RN 40) – PTE COLLÓN CURá (EMP. RN 237) |
DRY ROAD |
TCP |
EMP. RN 22 (ARROYITO) – STONE OF THE EAGLE |
DRY ROAD |
TCP |
STONE OF THE EAGLE – PTE COLLÓN CURá (EMP. RN 234) |
DRY ROAD |
TCP |
PTE COLLÓN CURA (EMP. RN 234) – CONFLUENCE (EMP. RP 63 AND 65) |
DRY ROAD |
TCP |
CONFLUENCE – EMP. RN 40 |
DRY ROAD |
TCP |
LAS LAJAS (EMP. RN 40) – EMP. RP 21 |
. |
T |
EMP. RP 21 – EMP. RP 23 (A 500M CUSTOMS AX PINE) |
POSSIBLE ROCKFALLS BETWEEN KM 46 AND 48. EQUIPMENT OPERATING. |
TCP |
EMP. RP 23 – AX PINE PASS |
|
T |
STEP PINE AX |
DISMISSAL SCHEDULE 9 AM TO 6 PM, CHECK IN 9 AM TO 7 PM. |
T |