Start of vacation: Kilometers of traffic jams in front of ski resorts

As predicted by the ÖAMTC, the access routes to the ski areas were particularly affected, where drivers had to be patient.Vienna. In Vorarlberg there were six kilometers of traffic jams in both directions on the Arlberg Expressway (S16) between Dalaas and Braz on Saturday morning. Kilometers of traffic jams were also recorded on numerous transport routes in Tyrol. The traffic jam on the Fernpass road (B179) was up to 21 kilometers long in both directions, and there was a 13-kilometer-long sheet metal avalanche on the B169/B181 following an accident near Wiesing. A nine-kilometer-long traffic jam developed on the A12 at the Kufstein/Kiefersfelden border crossing.

Six kilometers of traffic jam near Mondsee

The column covered six kilometers on the A1 near Mondsee heading west, and it was six kilometers long on the A10 between Kuchl and Golling. In Salzburg, there were also kilometers of backlogs and waiting times of up to an hour on Pinzgauer Straße (B311) in both directions due to the accident-related closure of the Schönberg Tunnel in Schwarzach.

Loading

info By clicking on the icon you can add the keyword to your topics.

info
By clicking on the icon you open your “my topics” page. They have of 15 keywords saved and would have to remove keywords.

info By clicking on the icon you can remove the keyword from your topics.

Add the topic to your topics.

Leave a Replay