Sorrowful situation of violation of construction contracts in Hang Buom ward

According to the regulations on management of planning and architecture of Hanoi Old Quarter (issued together with Decision No. 6398/QD-UBND dated October 24, 2013 of the Hanoi People’s Committee), construction works under the The old town street is only allowed to build 3 floors on the outside, 4 floors on the inside, the maximum height is 16 m, the construction density is 60% – 70%.However, people reported that, in many old streets of Hang Buom ward (Hoan Kiem district, Hanoi), recently, there have been continuous construction and renovation works showing signs of violation. building order (construction construction), raising the floor higher than the regulations, or expanding the floor to increase the usable area.As noted by the reporter, along Luong Ngoc Quyen Street (Hang Buom ward) appeared a series of old houses blatantly extended by the owner. More prominently, the new building No. 21 Luong Ngoc Quyen was built up to 7 floors high, the density almost occupies the entire area.Building No. 21 Luong Ngoc Quyen is being used for hotel business, named “May De Ville Premier Hotel & Spa”. On social networking sites, information regarding this hotel is posted a lot. The information is even advertised on the top floor of the hotel with a swimming pool to serve customers.Similarly, along Dao Duy Tu street (Hang Buom ward), there are also many expansion projects with more floors. The extended floors are usually made of iron frames and glass and corrugated iron panels.The expansion works are not only sloppy and lose the urban beauty, but also disrupt the planning of Hanoi’s old town.Seen from afar, another old house on Dao Duy Tu street has also been extended with an extra floor, standing out completely from other houses.Next to it, is the building No. 13 Dao Duy Tu Street, built up to 7 floors high.Project No. 13 Dao Duy Tu has completed the entire rough part, and installed glass doors… Currently, on the roof of the top floor, the owner of the project has closed the surrounding area.This is a picture of project number 40 Nguyen Sieu (Hang Buom ward), construction has exceeded 4 floors, there are signs of violation in height, breaking the plan.Project No. 40 Nguyen Sieu still shows no signs of stopping.The height of building No. 40 Nguyen Sieu is far superior to other buildings in the same street.List of works showing signs of violation of construction order, exceeding the height compared to regulations in Hang Buom ward.Although there are specific regulations, but I don’t understand why in fact, many streets in the Regulation on management of planning and architecture of the old quarter in Hang Buom ward still have many construction and renovation works marked signs of serious violations of construction infrastructure in terms of height, density, tumultuous deformation, change in construction structure, increase in usability…?

Leave a Replay