Renewal of the Bd Aïn Taoujtate sewerage network

The economic capital is the subject of major liquid sanitation infrastructure projects, including that relating to the renewal of the wastewater and rainwater network on Boulevard Aïn Taoujtate, under the jurisdiction of the district of Anfa (district prefecture of Casablanca-Anfa).

This project, the cost of which is estimated at 600,000 DH, consists in renewing a pipe 400 mm in diameter and 245 m in length, with the resumption of 20 private connections and 6 manholes.

It should be noted that Lydec launched this year structuring liquid sanitation projects in Greater Casablanca aimed at strengthening networks and basic infrastructure, including the liquid sanitation project in the North-East zone in Sidi Moumen and Sidi Bernoussi. .

In addition, the company is currently carrying out work for the evacuation of rainwater in Hay Hassani in the “Ferrara” district over an area of ​​134 ha. The project consists of the construction of two rainwater collection pipes of 1600 and 800 mm in diameter and 467 and 233 m, respectively.

Leave a Replay