The General Directorate of Traffic conducted traffic diversions and appointed traffic services to monitor the movement of cars during the implementation of the development and expansion works of the coastal road and Alexandria / Matrouh and the implementation of 9 rotation bridges in the distance from km 101 to km 154, which takes two months, provided that the work is throughout the whole day and is carried out Implementation of traffic diversions as follows:
– The direction coming from Alexandria towards Matrouh, diverting all vehicles from the areas of kilometer 93 to the beginning of the bridge leading to the new “southern coastal” road and continuing the journey until the end of the road in the areas of kilometer 127, then continuing to walk left from the bottom of the bridge as 127 in the direction of Matrouh and then back once more to the coastal road subtractive direction.
– The direction coming from Matrouh towards Alexandria, diverting all vehicles from the 132,500 kilometer areas on the right to an internal road in a residential area, then returning once more to the coastal road in the 132.0 kilometer areas.. Then taking the new “South Coastal” road from the 127 kilometer areas and continuing the walk until the end The road in the 93 kilometer areas “in front of Marina 1” and then continue walking once more on the coastal road towards Alexandria .
The General Traffic Department appointed the necessary traffic services and coordination with the executing company to put in place technical assistance and all equipment indicating the existence of works in the area to ensure the security and safety of citizens..