Today, Friday, the General Directorate of Giza Traffic began making traffic diversions in front of the traffic of cars due to the construction of the new 26th of July Corridor, in a 45-day work, amid the presence of traffic services to follow the movement of cars.
The General Directorate of Giza Traffic has appointed the necessary traffic services to meet any expected traffic densities and manage the traffic, coinciding with the implementation of the construction works of the new 26th of July Corridor (the bridge intersection of the 26th of July Corridor all the way to Ahmed Orabi Street passing through the top of the Barajeel area), which requires a closure. Totally on Street No. 2 circle, starting from its intersection with the street behind Safari Park until Airport Street only, for a period of 45 days, starting from 1 am on Friday, corresponding to 7/22/2022 until Sunday, corresponding to 4/9/2022, to implement construction works for Al-Kubra. Referred to.
The General Directorate of Giza Traffic made some traffic diversions as follows:
– Coming from Ezbet El Matar areas and wishing to walk in the direction of Ahmed Orabi Bridge and Ahmed Orabi Street, turn left on the street behind Safari Park, then enter right in the direction of Ahmed Orabi Bridge, all the way to Ahmed Orabi Street.
– Coming from Ezbet Al Matar areas and wishing to walk towards Al Barajeel areas, turn left on a street behind Safari Park, then enter right towards Ahmed Orabi Bridge, then continue walking on Ahmed Orabi Street until the first roundregarding, then turn and return once more on Ahmed Orabi Street and go up the Ahmed Orabi Bridge once more The direction of the house leading to Airport Street towards Al-Barajeel area.
– Coming from Ahmed Orabi Street and wishing to walk in the direction of Ezbet El-Matar areas, go up the Ahmed Orabi Bridge and continue walking on the Orabi axis until Safari Park Square, then turn around and return once more, then enter a right on a street behind Safari Park to reach the areas of Ezbet El-Matar.
– Coming from Al-Barajeel areas and wishing to walk in the direction of Ezbet Al-Matar areas, go up at the top of Ahmed Orabi Bridge, then continue walking on Ahmed Orabi Street until the first roundregarding, then turn around and return once more on Ahmed Orabi Street, and go up once more at the top of Ahmed Orabi Bridge and continue walking on the Orabi axis towards Safari Square Park, then turn around and back once more, then enter a right on a street behind the Safari Park, all the way to the areas of Izbat Al Matar.
For its part, the Giza Traffic General Administration has appointed the necessary traffic services and coordination with the implementing companies to put in place technical assistance and all equipment indicating the presence of works in the area, to ensure the security and safety of citizens.