Is the dredging of the port of Vauclin at an impasse?

INFO FRANCE-ANTILLES There is nothing to confirm that the desilting of the port of Vauclin can actually begin immediately as announced to the fishermen. Administrative and above all environmental constraints were not anticipated in time and the storage location for sludge and sediment does not, to date, comply with the requirements of the prefectural decree.

Leave a Replay