Highway works in execution will profit residents of Guairá and Caazapá

Asunción, IP Company.- The development works carried out on six sections of native roads in Guairá and Caazapá will profit communities in each departments.

The execution is supervised by technicians from the Growth Financial institution of Latin America and the Caribbean (CAF) and the director of Neighborhood Roads of the Ministry of Public Works and Communications, Julio Ríos and his crew, as a way to assure compliance with high quality requirements. and acceptable use of public assets allotted to those infrastructure works.

The six verified tons cowl virtually 90 kilometers of rural roads the place totally different duties are carried out, equivalent to the development of asphalt concrete and double floor therapy.

The works have been awarded in October 2021 and are a part of the “Mission to enhance native roads within the Jap Area”, with financing from CAF and the Growth Financial institution (FONPLATA).

That is the so-called MOPC No. 44/2021: “Worldwide Public Tender for the development works of sections of neighborhood roads within the departments of Caazapá and Guairá – Group 3, ID N° 398,706′′.

Verified batches

The actions developed embody Lot 1, part Colonia (Warehouse 50) – San Gervasio – Santa Cecilia- Yroysa- Pireka – Kaguereí Detour, division of Guiará (16 km), accountable for Constructora Feldmann SA

Lot 2 consists of the part Colonia (Warehouse 50) – San Gervasio – Santa Cecilia- Yroysa- Pireka – Kaguereí Detour, Guairá division, (14.62 km), of Paraguayan Constructions and Housing SA (COVIPA SA).

Additionally the Lot 3, part Abaí – Gral. Morínigo, Caazapá division, (14.9 km), of the EDIVI SA Development Firm; whereas Lot 4 covers the part Cruce Alpa – Lima, division of Caazapá, (17 km), awarded to Expertise of the South SAE

Equally, Lot 5 to the part Cruce Alpa – Lima, division of Caazapá (15.93 km), for which Caldetec Ingeniería SRL is accountable and Lot 6, part Fassardi- Kaguare’i, division of Guairá, (10.97 km). ), which is constructing Teco- Construmaq Consortium (Teco SRL- Construmaq South SRL)

The CAF supervision delegation is made up of Héctor Varela, head of mission; Antonio Martínez, monetary specialist and Marco Mejía, Environmental specialist.

#Highway #works #execution #profit #residents #Guairá #Caazapá
2024-05-30 08:45:51

Share:

Facebook
Twitter
Pinterest
LinkedIn

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.