The Havana Electric Company reported that, due to the generation deficit in the National Electric System (SEN), scheduled emergency power cuts will be necessary.
Customers in Blocks #1 and #2 in the capital will see their power supply interrupted between 10:00 am and 2:00 pm today.
Recommendations for the population
Table of Contents
Table of Contents
Citizens are urged to adopt energy-saving measures to reduce electricity consumption, avoid overloading the networks and thus reduce service interruptions. Authorities stress the importance of public cooperation to mitigate the impact of these outages and maintain the stability of the SEN.
The energy crisis has worsened due to the lack of electricity generation capacity in the country. Yesterday, service was restored in some areas at 7:55 am, but the disruptions began again at 10:10 am due to the capacity deficit. As of early today, service has not been fully restored in many areas.
National SEN overview this Saturday, September 14
The SEN shows an availability of 2,380 MW, while the current demand is 2,490 MW, which generates a deficit of 169 MW. Limitations in thermal generation amount to 523 MW, and 50 distributed generation plants remain out of service due to lack of fuel, affecting 402 MW.
Peak Hour Forecast
A critical situation is expected during peak hours, with a demand of 3,200 MW and availability of only 2,380 MW. This deficit of 820 MW could result in disruptions of up to 890 MW nationwide, which would imply far-reaching interruptions in the electrical service.
The Havana Electric Company and the Electric Union (UNE) continue to work to minimize the effects of this situation and recommend that the population stay informed and take the necessary measures to deal with possible interruptions.
#blackouts #Havana #today #due #deficit #electrical #system
– What are the main reasons for the scheduled power cuts in Havana?
Emergency Power Cuts Loom in Havana Due to Generation Deficit in National Electric System
The Havana Electric Company has announced that scheduled emergency power cuts will be necessary in certain areas of the capital city due to a generation deficit in the National Electric System (SEN). This unfortunate situation has arisen as a result of the country’s inability to meet the increasing demand for electricity, leading to a strain on the power grid.
Affected Areas and Timings
Residents in Blocks #1 and #2 in Havana will experience power outages between 10:00 am and 2:00 pm today. This scheduled interruption in electricity supply is aimed at reducing the strain on the SEN and preventing more widespread and prolonged power outages.
Public Cooperation Crucial to Mitigating the Impact
The authorities are urging citizens to adopt energy-saving measures to reduce electricity consumption and prevent overloading of the power networks. This public cooperation is essential to minimizing the impact of these outages and maintaining the stability of the SEN. By working together, we can reduce the frequency and duration of power cuts and ensure a more reliable supply of electricity.
Energy Crisis Worsens Due to Generation Capacity Deficit
The energy crisis in Havana has worsened in recent days due to the lack of electricity generation capacity in the country. Despite efforts to restore power supply, disruptions continue to occur, and many areas remain without electricity. The current situation is a stark reminder of the need for sustainable and long-term solutions to address the energy crisis in Cuba.
National Electric System Overview
As of Saturday, September 14, the SEN shows an availability of 2,380 MW, while the current demand is 2,490 MW, resulting in a deficit of 169 MW. The limitations in thermal generation amount to 523 MW, and 50 distributed generation plants remain out of service due to lack of maintenance and upgrading.
Call to Action
In light of this situation, we urge citizens to take immediate action to reduce their energy consumption. Simple measures such as switching off lights, appliances, and electronics when not in use can make a significant difference. We must work together to overcome this energy crisis and ensure a reliable and sustainable supply of electricity for all.
Conclusion
The scheduled emergency power cuts in Havana are an unfortunate but necessary measure to prevent more widespread power outages. We must all do our part to reduce energy consumption and support the efforts of the authorities to maintain the stability of the SEN. By working together, we can overcome this energy crisis and build a brighter future for our city and our country.
Keyword Tags: Havana, Electric Company, National Electric System, SEN, Power Cuts, Energy Crisis, Generation Deficit, Energy-Saving Measures, Public Cooperation, Sustainable Energy, Cuba.
Meta Description: Scheduled emergency power cuts to be implemented in Havana due to generation deficit in National Electric System. Citizens urged to adopt energy-saving measures to reduce electricity consumption and prevent overloading of power networks.
The overall stability of the electrical system.
Emergency Power Cuts Loom in Havana Due to Generation Deficit in National Electric System
The Havana Electric Company has announced that scheduled emergency power cuts will be necessary in certain areas of the capital city due to a generation deficit in the National Electric System (SEN). This unfortunate situation has arisen as a result of the country’s inability to meet the increasing demand for electricity, leading to a strain on the power grid.
Affected Areas and Timings
Residents in Blocks #1 and #2 in Havana will experience power outages between 10:00 am and 2:00 pm today. This scheduled interruption in electricity supply is aimed at reducing the strain on the SEN and preventing more widespread and prolonged power outages.
Public Cooperation Crucial to Mitigating the Impact
The authorities are urging citizens to adopt energy-saving measures to reduce electricity consumption and prevent overloading of the power networks. This public cooperation is essential to minimizing the impact of these outages and maintaining