E411: traffic disrupted for 10 km since this morning

Work on the E411 Namur – Luxembourg is planned from this Monday, October 3 between kms 159 and 148 between Léglise and Rulles in the direction of Luxembourg.

The installation of the signage has already begun this Thursday, September 29 in the evening.

A traffic lane will be maintained and switched in the opposite direction with a speed limit of 70 km/h towards Luxembourg.

Interchange 28 “Léglise” will be completely closed to traffic. A diversion via neighboring interchanges is possible with the exception of interchange no. 28a “Rulles” where the exit ramp will be inaccessible. The Léglise motorway area will also be inaccessible throughout the work period.

Two lanes will remain available (BAU and right-hand strip) towards Brussels with a speed limit of 70 km/h.

This work is scheduled from Monday October 3 to Friday November 5.

Leave a Replay