City street infrastructure of the Integration Bridge exceeds 90% and estimated completion in October

Asunción, IP Company.- The city lot of the Jap Metropolitan Hall, thought of very important for the performance of the Integration Bridge that connects Presidente Franco with Foz de Yguazú, Brazil, is in a sophisticated state with 90% of execution, and is estimated to be accomplished in October of 2024.

The work is promoted by the Ministry of Public Works, and financed by a mortgage of as much as USD 212 million from the Growth Financial institution of Latin America (CAF).

The Jap Metropolitan Hall features a set of civil and street works which can be being promoted within the division of Alto Paraná, across the Integration Bridge, already accomplished.

As soon as accomplished, this sector will facilitate the provisional reference to the Paraguayan street community, pending the 2 rural tons beneath development, that are at 44% and 60% progress.

There are six contracts in power and relating to the street half, the works are divided into two sectors that embody the city space and the agricultural half, whose execution is carried out in two tons, forming a street of virtually 31 km.

The development of the city lot is the duty of Constructora Acaray and consists of the asphalt paving of 4.6 kilometers, within the metropolis of Presidente Franco.

To this we should add entry to the Nationwide Administration of Navigation and Ports (ANNP); street entry to the brand new border crossing; the reference to rural entry to the reference to the bridge to be constructed over the Monday River and the reinforcement of short-term service roads, the MOPC reported.

Related Articles:  US Destroyer Shoots Down Three Drones while Escorting Commercial Ships in the Red Sea: Latest Updates

#City #street #infrastructure #Integration #Bridge #exceeds #estimated #completion #October
2024-06-18 18:56:14

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.