Staikouras for Thessaloniki Metro: Free transfers on the first days of operation

In particular, Mr. Staikouras said: “We are ready and finalizing the last details. We will have no negative surprises. There were too many difficulties and we are still trying to fix them” said, among other things, the minister and noted that due to all the delays the total budget, together with the expansion, interest and loans, will amount to 3 billion euros. “Ten prime ministers and respective ministers passed. It is a project that, due to delays, unforeseen events, cost much more than the original budget. The Metro will work for the whole of society, for all citizens” he pointed out.

Regarding the financing of the Metro extensions to the airport and western Thessaloniki, the Minister of Transport and Infrastructure noted: “at the moment we have only planned and we have not decided how we will move to look for financing. European funds may be used in the future. The point is to have the fiscal space to finance them.”

Mr. Staikouras also referred to the amendment of the ministry that was submitted to the Parliament and includes, among other things, the extension of the contracts of the drivers of the OSSTH until the end of June 2025 and provisions regarding the operation of the OSSTH that enriches the mission in the control of the provided transportation project and the distribution of the resources from the collection of fees. Regarding the construction project of the fly over, he emphasized that it is moving within the schedules, although, as he added, there are collectives that are trying to put up obstacles. Regarding the Tempe train accident, Mr. Staikouras pointed out that “we have a debt to advance the conclusion that is completed in February 2025”.

Weather – Tsatraphyllias: “Cold lake” may bring rain, snow and cold over the weekend

Marinakis: The free afternoon surgeries prove in practice what social policy means

Hatzidakis in Parliament: A budget that combines prudence with growth and social cohesion

The Thessaloniki Metro station that resembles a Formula One track! [φωτο-βίντεο]

#Staikouras #Thessaloniki #Metro #Free #transfers #days #operation

How does the code ensure that AdSense units are not displayed on mobile devices?

The provided code snippet‍ appears to be JavaSctipt code responsible for ‍managing ⁣various​ third-party integrations ‍on a website, including advertising platforms ⁣like Google AdSense, Taboola, and Adman.

Here's a breakdown of the code's ‍function:

* **Conditional AdSense Removal:**

- It first checks if ‍the screen size is mobile. If so, it removes AdSense units with the class "adsense-for-mobile". [[1](https://developers.google.com/adsense/)]

* **AdSense Asynchronous Loading:**

⁤ ​ ⁤ - If AdSense slots are present on the⁢ page (identified by the‍ class "adsbygoogle"), it prepares to load the AdSense JavaScript asynchronously. This likely involves fetching and executing⁢ the AdSense code to display ⁢advertisements. [[1](https://developers.google.com/adsense/)]

* **Other Integrations:**

⁢ - The⁢ code then ⁤manages the asynchronous loading of various other third-party scripts:

​ - **Phaistos Adman:** An ​advertising‌ platform.

⁣ - **OneSignal:** A push notification service.

- **Disqus:** A commenting system.

- **Taboola/Project Agora:** Content⁤ recommendation platforms.

- **Glomex:** A video platform.

-​ **Dalecta:** Likely another advertising platform.

- **Vidoomy:** A video advertising platform.

Let me know if you need me to ⁢elaborate on a specific part of the code!

Leave a Replay