Spotify Camp Nou grows in a big way: new images – Mundo Deportivo

Spotify Camp Nou grows in a big way: new images – Mundo Deportivo

The reform of the Spotify Camp Nou The stadium is facing some decisive months and the pace of the works continues to advance without complications this August despite the intense heat in Barcelona. Proof of this is that great progress has been made in the construction of the skeleton that will form the third tier of the future stadium. With the lower floors already concreted, around 70% of the pillars and beams of the structure The ground is already in place and from the South Goal area with the Grandstand to the North Goal, almost all of them are in place waiting for the formwork panels to be placed for the subsequent concreting process. To speed up this phase of construction, a series of scaffolding has also been installed from which the workers can work more easily and continue to progress in consolidating the structure of the Blaugrana stronghold.

This is what the Spotify Camp Nou looked like at the beginning of May

FCB

Spotify Camp Nou grows in a big way: new images – Mundo Deportivo

This is how the Spotify Camp Nou works are currently

FCB

In the previously mentioned part, most of the brackets that will be the VIP ring holder located between the second and third tier. The area that has seen the least changes in recent weeks is the Grandstand, although the foundations in the surrounding area Yes, they are presenting progress, especially in the space that the future store and cafeteria will occupy.

Read also

In the South Goal they are already doing work to reach the street level in Travessera de Les Corts and in the North Goal there is already a New vehicle access from Avinguda Joan XIII which will facilitate the work in this area of ​​the stadium. Another point to highlight is the progress in the parking foundationslocated in the Gol Sur area with Lateral and which will have 3,000 spaces once completed.

This is what the exterior of the Spotify Camp Nou looks like today

This is what the exterior of the Spotify Camp Nou looks like today

FCB

Progress in the interior

In addition to advances in the skeleton surrounding the Spotify Camp Nouthe work inside the stadium is also on track. installation of the lower part of the first tier is almost finished and the gaps between the first and second section of the stands are being closed. manholes in the second tier are also well defined. For its part, the concrete treatment to avoid leaks and prepare it for the installation of seats is almost finished, with some pending work in the area of ​​the North Goal corner with Lateral and in the Grandstand.

Work is underway inside the stands at the Spotify Camp Nou

Work is underway inside the stands at the Spotify Camp Nou

FCB

Work is underway inside the stands at the Spotify Camp Nou

Work is underway inside the stands at the Spotify Camp Nou

FCB

Leave a Replay