Asunción, IP Company.- The Authorities carried out the second aggressive dialogue with the 5 prequalified consortia within the name for bids – by way of Public-Non-public Alliance (PPP) – for the growth and enchancment works of the PY01 route, part Cuatro Mojones – Quiindy, which is 108 kilometers .
Representatives of the Ministry of Economic system and Finance (MEF), the Ministry of Public Works and Communications (MOPC), and the Legal professional Basic’s Workplace (PGR) had been current on the assembly, together with their technical and authorized specialists.
This undertaking, which covers the stretch from Cuatro Mojones to Quiindy over 108 km, shall be executed underneath the Public-Non-public Partnership (PPP) modality.
It’s value mentioning that the aggressive dialogue is a process for consultations and receipt of proposals for enhancements, additions or changes to the Bidding Phrases and Circumstances (PBC) and/or Proforma of the Contract with the prequalified consortia.
This can be a stage of the method for the technical, financial and/or monetary harmonization of the proposals based on the process within the regulatory decree.
In keeping with ministerial decision No. 2218, the prequalified consortia are: Desarrollo Vial al Sur (Sacyr Concesiones SL and Ocho A SA); Mercosur Routes (Tecnoedil SA, Alya Constructora SA, Construpar SA and Semisa Infraestructura SA); AG – Tocsa (AG Construções e Serviços SA and Tocsa SA); Rutas del Sur (Cointer Concesiones SL, Azvi SAU and Constructora Heiseke SA); and Rutas del Sur (Acciona Concesiones SL, Rovella Carranza SA and Concret Combine SA), thus involving a complete of 14 corporations, together with from Brazil and Spain.
In regards to the works
Typically phrases, the work required consists of upkeep, rehabilitation, opening of third lanes and the excellent enchancment of the drainage and signaling system all through the aforementioned part, with a contract time period of 30 years.
By way of this intervention, the goal is to extend the capability and enhance the passability of customers who flow into day by day within the space, in addition to to have an satisfactory transport infrastructure that connects the manufacturing areas with nationwide and regional markets and connecting seaports. worldwide.
The works – with an estimated funding of USD 430 million, shall be divided into 5 sections and can profit a complete of two,600,000 inhabitants of the departments of Central and Paraguarí.
#held #aggressive #dialogue #APP #PY01 #route
2024-05-25 03:56:52