2023-05-26 15:00:02
After the 300 km slowdown this followingnoon, the situation is improving on the Belgian road network.
Last update 6:40 p.m.
To reach the coast, the traffic is in accordion on the E40 Brussels Ostend with 15 minutes lost towards Ostend.
To reach Arlon, heavy traffic on the E411 motorway.
Many construction sites cause concern:
E411 between Neufchâteau and Léglise: + 7 minutes towards Arlon
E411 between Arlon and Habay-la-Neuve: +25 minutes to Namur
E42 between Rhisnes and Daussoulx: +7 minutes towards Liège
E42 between Manage and Le Roeulx: +7 minutes to Mons
E40 in the construction site on the Herstal bridge: +35 minutes vers Loncin.
1685140476
#Departure #long #weekend #traffic #jams #overloaded #roads