They confirm the possible inauguration date of the Chelato Uclés National Stadium, which teams would be playing?

2023-04-10

The wait is coming to an end and the football festival is returning to the capital, where fans of the Olympia and Motagua they might have their clubs back.

The members of the National Sports CommissionPhysical Education and Recreation, have already confirmed that the second cut to the new hybrid grass has been made.

The sowing of the Bermuda grass seed was installed from the month of February of this year and later the sewing of the synthetic threads was carried out, now the natural grass.

After this process, the care of irrigation and fertilization of the lawn has evolved in the best way and the mixture of artificial and natural grass has been a complete success.

After a month of its sowing, the growth of the hybrid grass has been the best and that is why it has already been possible to make two grass cuts.

Football in sight. While the grass reaches its indicated point, the Condepor authorities are already anticipating that the opening of the colossus of the capital would be for the final of the Closing tournament.

As stipulated by the National League, the catracho football final would be taking place on May 28 and if Olimpia and Motagua were involved, Chelato Uclés would be the venue.

If this event does not materialize, the Condepor authorities would be looking to organize a match with an international squad.

Leave a Replay