Watch.. the moment the floating villas arrived at the port of Yanbu, in preparation for their transfer to Shebara Island in the Red Sea project

Al-Marsad Newspaper: A video clip documented the arrival of the first batch of floating villas to the port of Yanbu, in preparation for their transfer to Shaybara Island in the Red Sea Destination project.

The video showed the floating villas designed in a circular shape, with some workers next to them.

The floating hotel villas are an ideal and safe destination for enjoying nature and coral reefs in the middle of the sea, inspired by the natural environment and made of polished stainless steel, as its modern design reflects sunlight and heat.

The Shebara Island project is part of the first phase of the Red Sea project, where tourists will be received in 2023. As for the overall project of the Red Sea, it will be completed in 2030 with (22) islands and (6) indoor sites, with a total of (50) hotels and (8000) hotels. room. Shibara the beginning of the experiment.

Share:

Facebook
Twitter
Pinterest
LinkedIn

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.