Commissioned in 2018, the Khalladi wind farm, 30 km from Tangier, generates a total installed capacity of 120 megawatts.
November 29, 2022 at 2:21 p.m.
Modified November 29, 2022 at 2:21 p.m.
Commissioned in 2018, the Khalladi wind farm, 30 km from Tangier, generates a total installed capacity of 120 megawatts.
The French specialist in engineering and services in the renewable energy sector, Dolfines, announcement in a press release the signature by its renewable energy services subsidiary, 8.2 Franceof a major wind turbine inspection contract in Morocco.
8.2 France, which signed the contract with Nomac (The First National Operation & Maintenance Company), Moroccan private operator in operation and maintenance for desalination and subsidiary of the Saudi group ACWA Powerinspectera 40 wind turbines from the Khalladi wind farmsays the same source.
Commissioned in 2018, the Khalladi wind farm, 30 km from Tangier, generates a total installed capacity of 120 megawatts.
“The wind turbines are installed on 80 meter masts and equipped with 90 m diameter rotors. The wind farm produces the equivalent of the annual electricity consumption of 400.000 habitants. It enables an annual reduction in CO2 emissions estimated at 144,000 tons.”
November 29, 2022 at 2:21 p.m.
Modified November 29, 2022 at 2:21 p.m.