The beginning of the first line of the high-speed train .. See the Ain Sukhna station “Tyre”

The Ministry of Transport continues the work of constructing and implementing the Sokhna station in the first line project of the high-speed electric train “Ain Sukhna – El Alamein – Matrouh”, where work continues around the clock to complete the implementation works. The Ain Sokhna station is the beginning of the first line of the express train.

It serves Ain Sokhna station, with a network The electric train The highway, Ain Sukhna area, both the tourist areas on the Red Sea and the industrial areas, as well as the Ain Sukhna port area, as well as extending its services to the new investment areas in the region, and the new city of Suez.

The length of the first line of the electric express train (Ain Sukhna – El Alamein – Matrouh – Fayoum) is 660 km, and it includes 22 stations. New and new cities on the railway network to transport passengers and goods through a fast, modern and safe means of transportation, as it will start from the city of Ain Sukhna on the Red Sea coast to the new city of El Alamein, passing through the new administrative capital, the 6th of October City and the city of Burj Al Arab.

The high-speed electric train system covers all parts of the Republic, in addition to being development arteries that serve the new and existing urban and industrial areas. It will contribute to reducing and shortening the time of trips between the governorates to more than half the time that the citizen currently takes, whether through the old train network or through the current roads linking the governorates. It is also It serves the transportation of goods between ports and governorates and shortens the time period for transporting these goods.

Leave a Replay