A few days and the latest means of transportation in Egypt operates. electric train The light LRT, which was piloted without passengers before the actual operation, and the train connects the city of Salam in Cairo with the New Administrative Capital and a number of new cities, including Badr, Al-Shorouk, the tenth of Ramadan, New Heliopolis and Al-Mustaqbal, in addition to the new administrative capital, as well as connecting with the electric express train on Sokhna Road.
In the following points, a summary of everything you need to know regarding the electric light rail.
The train has carriages for women.
– Heading from the City of Knowledge station or the industrial area to the City of Arts and Culture station, change the train at Badr station.
– The one heading from the City of Arts and Culture station to the City of Knowledge station or the industrial zone changes the train in Badr City.
The one coming from Adly Mansour station to the city of knowledge or the industrial zone in the tenth is waiting for the train written on the front of it is the city of knowledge
The number of train stations is 12, and the ticket price for 3 stations is 15 pounds.
Ticket price for up to 5 stations is EGP 20, and ticket price for up to 7 stations is EGP 25.
The ticket price up to 9 stations is 35 pounds, and the train has a branch from Badr City to the Tenth City, and the stations were operated in the first phase in this direction, which is the Industrial Zone and the Knowledge City.
The train stations to be operated from Adly Mansour to the Administrative Capital are: “Adly Mansour Station – Al-Obour Station – Al-Mustaqbal – Al-Shorouk – New Heliopolis – Badr – Al-Rubiki – Capital Gardens – Capital Airport – City of Arts and Culture.”
The train stations to be operated from Adly Mansour to Asher City are: “Adly Mansour Station – El Obour Station – Future – El Shorouk – New Heliopolis – Badr – Industrial Zone – Knowledge City.” Then the rest of the stations for El Asher City will be completed in the fourth phase of the project, which is “West El Asher – Tenth of Ramadan City Center.
The LRT Light Electric Rail Workshop is located in Badr City.
The workshop includes 26 buildings and covers an area of 80 acres.
Each train has 6 cars.
The total number of trains in the first and second stages is 22 trains.
The cost of the 22 trains is $227 million.
The design speed of the trains is 120 km/h.