rainwater drainage construction: construction of rainwater drainage; Bahrain is 85 percent complete – rainwater drainage construction Bahrain

Bahrain: Construction of rainwater harvesting network 85 per cent complete Bahrain Ahmed Abdul Aziz Al Khayyat, Under Secretary, Public Works Department, said. Bahrain is moving ahead with its plans over time. He said the necessary arrangements have been made for it. The media reports the news.

Also Read: Qatar to host FIFA World Cup: Qatar’s Emir

Sanad Al Askan Valley will be connected to the acreage drainage network. This region of Bahrain is experiencing major problems due to rainfall. That is why this area itself was chosen for rainwater harvesting. The construction of 1326 m long drainage lines has now been completed. There were big problems with not being able to store rain water and the big problem will be solved with the completion of new drainage construction works. All the necessary construction work is underway.

Also Read: Dubai-Qatar air fares to rise ahead of World Cup 7,110 dirhams on November 20!

This system is made in Bahrain of the highest quality. The Ministry is taking necessary steps to ensure the infrastructure of the country. The rainwater harvesting project is one of the most important aspects of urban development. It’s a big problem during the rainy season. When it rains heavily, there will be huge floods in various places. Many houses and places will be flooded and damaged. A lot of roads are being destroyed like this. The solution is to come up with a new rainwater harvesting project. The ministry urged the people to heed the warning given by the authorities.

news/ncp-president-sharad-pawar-meet-k-v-thomas/videoshow/91784539.cms">

Sharad Pawar says he would welcome KV Thomas to the NCP if he is interested

Leave a Replay