The 303 power outage caused 5.49 million households in Taiwan to be affected due to the human negligence of Xingda Power Plant. The Executive Yuan requested the Ministry of Economic Affairs to submit a review report, and related accountability and compensation have attracted much attention. However, some scholars said that in addition to Xingda Power Plant, The real problem lies in the Ryuzaki substation. Even the two fool-proof protection mechanisms are misjudged and malfunctioned, so it is so serious. Because Taiwan’s power grid is complex and professional, we call on the government to establish an “independent power supervision mechanism” to avoid the recurrence of the blackout incident. .
President Tsai Ing-wen and Executive Director Su Zhenchang inspected the Xingda Power Plant and the Longqi Substation respectively last weekend. Due to human negligence, 303 major power outages were caused, affecting 5.49 million households in Taiwan. The review report was issued. Seeing that the deadline for submitting the report has arrived, the content of the review has attracted much attention.
Peng Shuanglang, chairman of the Taipei Computer Association, said, “We believe that there should be enough margin, so that this spare capacity is sufficient. This is also a prerequisite.”
Whether it is the Computer Association or the Federation of Trade Unions who are interested in raising thousands of words regarding energy policy, Taiwan’s power supply is stable and unstable, not only the private sector, but the industry is more concerned, but the outside world is curious, a power plant failure, and the entire central and northern Taiwan fell. Where is it?
Zeng Wensheng (3/4), Undersecretary of the Ministry of Economic Affairs, said, “Enough to do a good job in a down-to-earth way, and let the electricity be used for some repeated confirmation work.”
Guo Zhengqian, director of the Department of Electrical Engineering of National Taiwan University of Science and Technology, said, “The fool-proof device believes that the so-called protection power believes that it is not a real accident, but just a concept of false signals, so it is locked in the reverse direction. This protection mechanism, So it should be in Xingda, the protection mechanism that jumped first didn’t work, so I had to turn to Ryuzaki, which is very sensitive, so if there was a problem in Ryuzaki, almost all the important power plants were jumped out by jumping off. .”
Scholars believe that the Longqi Substation is an important transshipment center for the transmission of electricity from the south to the north. The misjudgment and failure of the two foolproof protection mechanisms of the Xingda Power Plant and the Longqi Substation will lead to serious power outages. In addition to insufficient backup capacity, scholars call for The government should establish an “independent electrical industry supervision mechanism” to avoid the recurrence of the blackout incident. As for the relevant human negligence, accountability and compensation, the report of the Ministry of Economic Affairs is awaited from all walks of life.
(FTV News/Reported by Chen Yanlin and Zhuang Baihua in Taipei)
More FTV news reports
2 old stores exit, Taipei Wenluoding Bookstore District is likely to decline?
Blood cancer patient who claims to have hallucinations beats nurses to deformed fingers
The front crossing the Keelung rain dog statue with a “triangular cone” to cover the rain